Projects Executed


 

Some Projects delivered for Shell in the last 3 Years

S/N Project Description Location Man Hour Year
1. Sectional replacement at Kolo creek W3T Kolo creek 1,589 2016
2. Sectional replacement at Ahia W3S AHIA 1,280 2015
3. OBGN W28T GLL Integrity checks Obigbo 1,482 2015
4. Re-routing of Obgb W28T to W25T GLL Obigbo 3,424 2015
5. Inspection and re-certification of gas facilities gantry, vessel and boiler unit Shell gas, Agbara Gas Plant 1,700 2014
6. Fabrication and replacement of 3" ligament line Imo River 1 & 2 F/S 4,000 2014
7. Emergency flow line leak repair in peaeg and districts of pea Peaeg and districts pea 11,672 2013
8. Fabrication of 2’’ Effluent gas line at Ekulama 1 and 2 Ekulama 7,200 2013
9. Sectional Replacement of 4’’ line Kolo creek 3,500 2013

Some Projects delivered for Total in the last 3 Years

S/N Project Description Location Man Hour Year
1. Relocation of racks from main warehouse to warehouse 2 Onne 1,680 2015
2. Obite potable water upgrade OML 58,Obite 3,500 2015
3. Modification of Heavy Racks in Onne Warehouse Onne 1,291 2014
4. Fabrication and installation of chemical drum, piping, recovery skid and pipe supports OML 102/Ofon 4,800 2013
5. Obite 2014 Vessel inspection and preparatory works OML 58,Obite 1,700 2014
6. Insulation of forane unit OML 58,Obite 2,500 2014
7. Ogbogu 2013 Vessel cleaning, inspection and preparatory works OML 58,Obite 2,000 2013
8. Design, fabrication and installation 1”stainless chemical injector line 4,000 2013

Electrical/ Instrumentation

S/N Project Description Client Location
1. Completion of Oforolla community electricity project (transformer installation/distribution) SPDC Oforolla Community
2. Installation of solar powered perimeter lighting at Ebubu manifold SPDC Ebubu
3. Disconnection and reconnection of G05 to G11 TOTAL E&P Total Village
4. Electrification upgrade of Nmirinwanyi Obeama community. SPDC Obeama
5. Procurement of 5N0. 500KVA distribution transformer for Afam project SPDC Afam

Engine and Generator

S/N Project Description Client Location
1. Revamping of emergency diesel generator at OML 116 at Agbara platform AGIP Agbara Platform
2. Supply and installation of NP4: GP Junction control box for ignition control (CAT G3512) TOTAL E&P Obagi
3. Supply /replacement of water temperature sensor and electronic modular panel for G 4 perkins Gen set. TOTAL E&P Total Village
4. Total overhaul of diesel emergency generator at OML-116 AGIP Agbara Platform
5. Call off contract on preventive maintenance of G 89 Perkins-set TOTAL E&P Well Compound
6. Supply and installation of water pump, fan belt and oil seal for 250KVA Gen Set TOTAL E&P Total Village
7. Supply and installation of 150KVA SMO generator set with sound proof and automatic start. TOTAL E&P Total Base